Patna: Traffic movement on Patna’s Rajendra Nagar flyover has been suspended until November 5, 2026, to facilitate underground construction work for the Patna Metro project. The closure has disrupted daily commutes between Kankarbagh, Rajendra Nagar and Kadamkuan, with motorists facing congestion and diversions.
Barricades have been installed at both ends of the flyover, while police personnel have been deployed to enforce the restrictions. The sudden change in traffic arrangements reportedly left several commuters scrambling to find alternative routes, with some motorists also arguing with police personnel on duty.
Local residents have expressed frustration over the lack of advance notification, saying an earlier announcement would have helped them plan their journeys and avoid delays.
Dahanush Setu Designated as Alternative Route
With the Rajendra Nagar flyover closed, motorists have been directed to use Dhanush Setu to reach their destinations. However, the diversion means some commuters must travel longer distances, increasing journey times.
Traffic congestion has been reported around the connecting roads on both sides of the flyover, affecting movement through the surrounding areas.
Residents said the sudden disruption had affected their daily travel plans and called on the authorities to communicate major traffic changes well in advance.
Closure Linked to Underground Patna Metro Construction
The restriction is part of the PC-03 construction phase of the Patna Metro project, which involves excavating a tunnel beneath the railway overbridge (ROB).
The flyover has been closed to traffic as a safety measure during the construction work. An information board installed by the construction agency states that the restriction will remain in force until November 5, 2026.
Residents Demand Advance Traffic Alerts
Residents have urged the authorities and construction agencies to install information boards on major approach roads before implementing significant traffic restrictions.
They said timely announcements, clear diversion signs and advance information about alternative routes would help motorists plan their journeys and reduce congestion.
While acknowledging the importance of safety during metro construction, residents stressed that better communication about traffic changes is essential to minimise inconvenience to the public.





















