Patna Press
  • Home
  • Patna
  • Bihar
  • Politics
  • Campus Buzz
  • Crime
  • Nation
  • World
  • Infra
  • Business
  • Lifestyle
  • Opinion
  • About us
No Result
View All Result
  • Home
  • Patna
  • Bihar
  • Politics
  • Campus Buzz
  • Crime
  • Nation
  • World
  • Infra
  • Business
  • Lifestyle
  • Opinion
  • About us
No Result
View All Result
Patna Press
No Result
View All Result
Home Infrastructure

JP Ganga Path Phase 2: Patna to Get a High-Speed Lifeline as Rs 5,500-Crore Project Begins in December

Work on the Rs 5,500 crore, 35km high-speed corridor linking Patna with western Bihar and eastern Uttar Pradesh is set to begin in December.

Staff Reporter by Staff Reporter
November 20, 2025
in Infrastructure, Patna
Reading Time: 2 mins read
This 7KM Stretch of Patna’s Ganga Driveway Is Turning Into A World-Class Tourist Hub— Here’s What’s Coming
0
SHARES
129
VIEWS
Share on FacebookShare on Twitter

Patna: Patna is set for a significant upgrade to its transport infrastructure as work begins on the second phase of the JP Ganga Path, a project expected to reshape mobility across Bihar and into eastern Uttar Pradesh.

Construction on the 35.65km corridor is due to start in December, according to the Bihar State Road Development Corporation. The project, estimated at Rs 5,500 crore, will link Digha in Patna to a proposed modern bridge over the Son River near Koilwar, via Sherpur. Officials say the aim is to offer “fast, safe and high-speed” connectivity between the capital and regions including Buxar, western Bihar and parts of Uttar Pradesh.

Nearly 18km of the route will be elevated to ease congestion in dense parts of the city, ensuring uninterrupted traffic flow. The project is being developed under the state’s “Hum Model”, in which the construction agency is responsible for building and maintaining the road for 15 years.

Under the financial structure, the agency will invest Rs 3,300 crore, while the state government will contribute Rs 2,200 crore – 40% of the total. The government will repay 60% of the cost, including interest, to the agency over the 15-year maintenance period, with additional payments earmarked for annual upkeep.

Authorities have instructed the contractor to begin site mobilisation, including transporting materials, with the aim of completing the project in around four years.

Once opened, JP Ganga Path Phase 2 is expected to deliver a significant improvement in regional connectivity. The route will link directly to five major bridges over the Ganga – Digha, Sherpur–Dighwara, Veer Kunwar Singh, Janeshwar Mishra and the Buxar–Ghazipur crossing.

The corridor will also enhance access to western Bihar and eastern Uttar Pradesh through its connection to the Koilwar Bridge. Officials say travel between Patna and Buxar could eventually be reduced to high-speed transit at 100–120km/h, with Buxar serving as a gateway to the Purvanchal Expressway and further onward to Delhi.

State planners claim the project will not only alter traffic patterns in Patna but stimulate broader economic activity across Bihar and Purvanchal, positioning the new corridor as a catalyst for growth in the region.

Tags: BiharBihar InfrastructureBihar NewsHigh-Speed CorridorJP Ganga PathJP Ganga Path Phase 2Patna

Related Posts

Patna Metro Picks Up Speed as Officials Inspect Underground Tunnels Across Key Corridor
Patna

Patna Metro Picks Up Speed as Officials Inspect Underground Tunnels Across Key Corridor

April 18, 2026
Bihar Vigilance Books Engineer For Disproportionate Assets, Conducts Multi-Location Raids In Patna
Crime

Bihar Vigilance Books Engineer For Disproportionate Assets, Conducts Multi-Location Raids In Patna

April 18, 2026
Amity Film Festival 2026 Concludes In Patna With Chandan Roy Inspiring Young Creators
Campus Buzz

Amity Film Festival 2026 Concludes In Patna With Chandan Roy Inspiring Young Creators

April 17, 2026
Next Post
Bihar Cabinet 2025: Ram Kripal Yadav Joins Nitish Kumar’s Cabinet, Once Counted Among Lalu Prasad’s Most Trusted Aides

Bihar Cabinet 2025: Ram Kripal Yadav Joins Nitish Kumar’s Cabinet, Once Counted Among Lalu Prasad’s Most Trusted Aides

PM Modi Congratulates Nitish Kumar After Swearing-In, Says ‘New Momentum Will Be Achieved’

PM Modi Congratulates Nitish Kumar After Swearing-In, Says ‘New Momentum Will Be Achieved’

Anant Singh’s Bail Plea Likely to Be Heard This Week, Oath as MLA Only After Release

Mokama MLA Anant Singh to Remain in Jail as Bail Denied in Dularchand Yadav Murder Case

Instagram

  • Bihar Chief Minister Samrat Choudhary was seen declining to wear a skullcap offered to him at a public event. In the clip, he gently stops the person, takes the cap, and moves it aside—without any visible altercation.
⏱️ The moment comes within 48 hours of his swearing-in, sparking conversations about his political messaging and leadership style.
💬 Supporters call it a clear ideological signal. Critics see it as symbolic politics.

#Bihar #BiharPolitics #SamratChoudhary #BiharNews
  • Hot and dry conditions continue in Patna, while districts like Araria, Kishanganj, and Supaul may witness light rain, thunderstorms, and gusty winds in the next 24 hours. Residents advised to stay cautious amid rising temperatures and sudden weather changes.

#BiharWeather #PatnaWeather #WeatherUpdate #ThunderstormAlert #HeatWave #IMD #RainAlert #StaySafe
  • Late-night police raid at Beur Jail, Patna under the leadership of City SP Bhanu Pratap Singh. Intensive search operation conducted with multiple DSPs, police teams, and BMP personnel under the supervision of Patna Sadar SDO.

#Patna #BeurJail #PoliceRaid #LawAndOrder #BiharNews
  • 🚨 Security Boost for Bihar Leadership

The Bihar government has upgraded the security cover of Deputy CMs and to ‘Z’ category 🔒

With 24x7 protection, commandos, escort vehicles, and advanced surveillance now in place, the move comes after fresh security assessments and highlights the state’s focus on safeguarding key leaders.

👮‍♂️ Tight security. Constant vigilance. No compromise.

#BiharNews #SecurityUpdate #ZCategorySecurity #BiharPolitics #IndiaNews #LeadershipSafety #BreakingNews #Patna #Governance #PublicSafety
  • ✨ Confused about the date? You’re not alone!
Akshaya Tritiya 2026 falls between April 19 & 20, with traditions varying based on tithi timing ⏳
Whether you shop for gold 💛 or give in charity 🙏 — it’s all about शुभ शुरुआत and lasting prosperity 🌼
🛍️ Auspicious shopping window:
April 19 (10:49 AM) ➡️ April 20 (5:51 AM)
Celebrate the spirit of abundance, faith & new beginnings ✨
#AkshayaTritiya #AkhaTeej #ShubhMuhurat #GoldShopping #FestiveVibes #NewBeginnings #Prosperity #HinduFestival #IndiaFestivals #AuspiciousDay
  • Boosting Bihar’s dairy future 🐃✨
Scientists at Bihar Animal Sciences University begin IVF trials in Murrah buffaloes to enhance breed quality and increase milk production. A step toward stronger livestock, better yields, and higher farmer incomes 🌾🥛
Hashtags:
#BiharNews #DairyDevelopment #IVFTechnology #BuffaloFarming #MurrahBuffalo #AnimalHusbandry #FarmersIncome #AgriInnovation #MilkProduction #RuralDevelopment #Biotechnology #IndiaFarming #BiharDevelopment #Livestock #FutureOfFarming
  • Free healthcare just got easier in Bihar 💙
Starting now, Ayushman Arogya Camps will be held on the 14th of every month across government health centres 🏥
Get access to 8 free medical tests, medicines, doctor consultations, yoga sessions, and more — all in one place!
A big step towards accessible and affordable healthcare for every citizen 🙌
#AyushmanArogya #AyushmanBharat #BiharHealth #FreeHealthcare #HealthForAll #BiharNews #PublicHealth #HealthcareIndia #WellnessForAll #HealthyIndia #GovernmentInitiative #IndiaNews
  • Patna is stepping up for a cleaner tomorrow 🚮✨
Under the Swachhata Hi Seva campaign, Patna Municipal Corporation cleared 85 garbage points across the city with active public participation 💪
Clean streets don’t happen by chance—they happen by choice. Let’s do our part by using proper waste disposal and keeping our surroundings clean 🌱
#Patna #CleanPatna #SwachhataHiSeva #SwachhBharat #WasteManagement #CleanIndia #BiharNews #UrbanSanitation #CivicSense #PublicParticipation #GoGreen #Sustainability #SmartCity #KeepItClean
  • From Patna to a purpose-driven startup 🇮🇳
Ravi Kumar turned a simple problem into a powerful solution for the Indian Armed Forces.
Serving those who serve the nation ❤️
#StartupIndia #BiharPride #Entrepreneurship #IndianArmedForces #Inspiration #StartupStory #MadeInIndia #Patna #Defence #Innovation #SuccessStory #udChalo
Railways Plans New Vande Bharat Between Bihar And UP; Routes Under Review

Railways Plans New Vande Bharat Between Bihar And UP; Routes Under Review

by Staff Reporter
April 18, 2026
0

A new Vande Bharat Express between Darbhanga and Varanasi is under consideration, with officials evaluating two possible routes.

Patna Metro Picks Up Speed as Officials Inspect Underground Tunnels Across Key Corridor

Patna Metro Picks Up Speed as Officials Inspect Underground Tunnels Across Key Corridor

by Aditi Srivastava
April 18, 2026
0

A ground-level inspection of Patna Metro’s underground tunnels shows steady progress, with authorities pushing to complete a key 12-station corridor...

Moon in Taurus Brings Mixed Fortunes as Some Signs Gain and Others Face Strain

A Day of Highs and Lows: Horoscope Urges Calm for Capricorn While Aries and Libra Enjoy Success

by Aditi Srivastava
April 18, 2026
0

Astrological forecast for April 18 highlights mixed fortunes, calling for patience and smart decisions.

Bihar Government Looks to Model Ganga Revival on Europe’s Rhine as Rs 300 Crore Ship Repair Hub Takes Shape in Patna

Patna Ganga Bridge Project Delayed: Only 70% Work Completed in 5 Years, Deadline Pushed to 2027

by Reporter
April 18, 2026
0

Patna: Construction of the new four-lane bridge over the Ganga river alongside the Mahatma Gandhi Setu in Patna has missed...

Railways Plans New Vande Bharat Between Bihar And UP; Routes Under Review
Bihar

Railways Plans New Vande Bharat Between Bihar And UP; Routes Under Review

by Staff Reporter
April 18, 2026
0

A new Vande Bharat Express between Darbhanga and Varanasi is under consideration, with officials evaluating two possible routes.

Read moreDetails
Patna Metro Picks Up Speed as Officials Inspect Underground Tunnels Across Key Corridor

Patna Metro Picks Up Speed as Officials Inspect Underground Tunnels Across Key Corridor

April 18, 2026
Moon in Taurus Brings Mixed Fortunes as Some Signs Gain and Others Face Strain

A Day of Highs and Lows: Horoscope Urges Calm for Capricorn While Aries and Libra Enjoy Success

April 18, 2026
Bihar Government Looks to Model Ganga Revival on Europe’s Rhine as Rs 300 Crore Ship Repair Hub Takes Shape in Patna

Patna Ganga Bridge Project Delayed: Only 70% Work Completed in 5 Years, Deadline Pushed to 2027

April 18, 2026
seed farm

Bihar to Become Seed Self-Reliant, Opens 300+ Nurseries for Private Companies

April 18, 2026

Recent Posts

  • Read It and It’s Gone: WhatsApp’s Upcoming Feature Could Change How You Message Forever
  • Bihar Government Tightens School Rules: First-Period Attendance Now Mandatory, Strict Action Warned for Lapses
  • Railways Plans New Vande Bharat Between Bihar And UP; Routes Under Review
  • Patna Metro Picks Up Speed as Officials Inspect Underground Tunnels Across Key Corridor
  • A Day of Highs and Lows: Horoscope Urges Calm for Capricorn While Aries and Libra Enjoy Success
Railways Plans New Vande Bharat Between Bihar And UP; Routes Under Review

Railways Plans New Vande Bharat Between Bihar And UP; Routes Under Review

by Staff Reporter
April 18, 2026
0

A new Vande Bharat Express between Darbhanga and Varanasi is under consideration, with officials evaluating two possible routes.

Patna Metro Picks Up Speed as Officials Inspect Underground Tunnels Across Key Corridor

Patna Metro Picks Up Speed as Officials Inspect Underground Tunnels Across Key Corridor

by Aditi Srivastava
April 18, 2026
0

A ground-level inspection of Patna Metro’s underground tunnels shows steady progress, with authorities pushing to complete a key 12-station corridor...

Moon in Taurus Brings Mixed Fortunes as Some Signs Gain and Others Face Strain

A Day of Highs and Lows: Horoscope Urges Calm for Capricorn While Aries and Libra Enjoy Success

by Aditi Srivastava
April 18, 2026
0

Astrological forecast for April 18 highlights mixed fortunes, calling for patience and smart decisions.

Bihar Government Looks to Model Ganga Revival on Europe’s Rhine as Rs 300 Crore Ship Repair Hub Takes Shape in Patna

Patna Ganga Bridge Project Delayed: Only 70% Work Completed in 5 Years, Deadline Pushed to 2027

by Reporter
April 18, 2026
0

Patna: Construction of the new four-lane bridge over the Ganga river alongside the Mahatma Gandhi Setu in Patna has missed...

Recent News

  • Read It and It’s Gone: WhatsApp’s Upcoming Feature Could Change How You Message Forever
  • Bihar Government Tightens School Rules: First-Period Attendance Now Mandatory, Strict Action Warned for Lapses
  • Railways Plans New Vande Bharat Between Bihar And UP; Routes Under Review
  • Home
  • Patna
  • Bihar
  • Politics
  • Campus Buzz
  • Crime
  • Nation
  • World
  • Infra
  • Business
  • Lifestyle
  • Opinion
  • About us

© 2026 PatnaPress.com

No Result
View All Result
  • Home
  • Patna
  • Bihar
  • Politics
  • Campus Buzz
  • Crime
  • Nation
  • World
  • Infra
  • Business
  • Lifestyle
  • Opinion
  • About us

© 2026 PatnaPress.com