Patna Press
  • Home
  • Patna
  • Bihar
  • Politics
  • Campus Buzz
  • Crime
  • Nation
  • World
  • Infra
  • Business
  • Lifestyle
  • Opinion
  • About us
No Result
View All Result
  • Home
  • Patna
  • Bihar
  • Politics
  • Campus Buzz
  • Crime
  • Nation
  • World
  • Infra
  • Business
  • Lifestyle
  • Opinion
  • About us
No Result
View All Result
Patna Press
No Result
View All Result
Home Patna

Patna Metro Set to Launch on Independence Day as Construction Nears Completion

Staff Reporter by Staff Reporter
July 17, 2025
in Patna
Reading Time: 2 mins read
Patna Metro Rollout Uncertain on Independence Day, Officials Propose New Date
0
SHARES
19
VIEWS
Share on FacebookShare on Twitter

Patna: The Patna Metro Rail Corporation (PMRC) has confirmed that operations on the first phase of the Patna Metro will commence on August 15. With just weeks to go, the project is entering its final stretch, with visuals and a poetic message shared by PMRC highlighting both progress and emotion surrounding the long-awaited infrastructure upgrade.

In a post on social media, PMRC said, “Momentum never stops – from steel to soul, your metro is being built wholeheartedly at every turn. The silence of waiting is breaking… and Patna is emerging.” The message, accompanied by images of ongoing construction at the Patna Metro Depot, emphasised the transformative spirit of the project. Updates included isolator installations, OHE BKT adjustments, and rail shifting work at the turnout zone, all part of what PMRC described as “the rhythm of Patna’s awakening”.

In a significant move to accelerate the project, the Bihar Cabinet has approved a budget of around Rs 200 crore for the Patna Metro’s priority corridor. As part of this, the Delhi Metro Rail Corporation (DMRC) will provide operational support by leasing three train sets, each with three coaches, for three years. DMRC will also be responsible for operations and maintenance, for which it will be paid Rs 179 crore. An additional Rs 21.15 crore has been earmarked for leasing the trains.

Deputy Chief Minister Samrat Chaudhary explained that these train sets, originally built for the Pune Metro, are equipped with advanced onboard signalling systems. “Renting the trains is financially more viable,” he said, adding that this approach would avoid compatibility issues with existing signalling infrastructure. A total of Rs 13.25 crore will be spent on leasing, with Rs 7.9 crore allocated for transportation, insurance, and regulatory approvals.

Phase one to run from Malahi Pakadi to ISBT

The inaugural 6.5-km stretch of the Patna Metro – running from Malahi Pakadi in Kankarbagh to ISBT – will form the project’s priority corridor. Work is progressing rapidly on stations along this route, with finishing touches being added to waiting areas, ticket counters, toilets, and power systems. However, the Khemnichak station remains incomplete and will be bypassed during the initial phase of operations.

Push for affordable electricity

A separate hearing is scheduled for July 22 by the Bihar Electricity Regulatory Commission to consider a proposal for concessional electricity rates for the metro. Metro authorities argued that the service, intended for public benefit, should be treated on par with the railways and industry in terms of energy tariffs. Officials warned that without subsidised electricity, fare prices could increase, impacting affordability for commuters. The commission has reserved its decision following preliminary discussions.

 

Tags: BiharBihar NewsDMRCPatnaPatna MetroPatna Metro InaugrationPatna Metro Rail Corporation

Related Posts

Patna Arts College students paint colourful Chhath-themed murals on walls along the approach road to Krishna Ghat in Patna.
Festivals

PMC Gives Patna’s Ganga Ghat Roads A Festive Touch, Young Artists Paint Chhath Murals

November 6, 2026
Fire Department Deploys 450 Personnel Across 9 Zones For Diwali 2026
Patna

Fire Department To Deploy 450 Personnel Across 9 Zones In Patna For Diwali, 48 Sensitive Locations Identified

November 6, 2026
CIMP Organises 5th Management Case Conference 2026 In Patna
Patna

CIMP Hosts 5th Management Case Conference In Patna, 29 Research Cases Presented Across Five Sessions

November 6, 2026
Next Post
PM to Launch Major Infrastructure Push in Bihar and West Bengal

PM to Launch Major Infrastructure Push in Bihar and West Bengal

Three Arrested in Kolkata Over Gangster Chandan Mishra’s Murder in Patna; STF Questions Sheru in West Bengal Jail

Five Suspects Identified in Murder of Criminal Chandan Mishra at Patna's Paras Hospital

Tejashwi Yadav Raises Alarm Over Voter List Revision in Bihar, Alleges Targeting of Yadav-Dominated Areas

Tejashwi Yadav Raises Alarm Over Voter List Revision in Bihar, Alleges Targeting of Yadav-Dominated Areas

Instagram

  • Patna Municipal Corporation has started decorating walls along Ganga ghat approach roads with Chhath-themed paintings. Students of Patna Arts College are creating the artwork, which also carries messages promoting cleanliness ahead of Chhath Puja 2026.

#ChhathPuja2026 #PatnaNews #PMC #PatnaArtsCollege #PatnaPress
  • Bihar has approved ₹398 crore for the development of two proposed industrial areas in Madhubani district. Land acquisition is also underway across Arwal, Munger and Patna, along with 100 acres in Patna for sports infrastructure.

#BiharNews #Madhubani #IndustrialDevelopment #LandAcquisition #PatnaPress
  • Netaji Subhas Medical College and Hospital (NSMCH), Bihta, has received National Medical Commission approval for 44 additional postgraduate medical seats, taking its total PG intake from 74 to 118. The approval also introduces three new specialisations: Community Medicine, Forensic Medicine and Toxicology, and Respiratory Medicine, with four seats in each.
#NSMCH #MedicalEducation #BiharNews #PGMedicalSeats #Bihta
  • Indian Bank has opened applications for 1,500 Apprentice posts under its 2026 recruitment programme. Eligible graduates aged 20–28 can apply online until November 25, 2026. The selection process includes a written examination, local language test, document verification and medical fitness assessment.
#IndianBank #ApprenticeRecruitment2026 #BankJobs #GovernmentJobs #BiharJobs
  • The Supreme Court of India has announced 130 vacancies for Junior Court Attendant posts under its 2026 recruitment drive. Applications are open from November 4 to November 25, with the examination scheduled for December 26. Candidates should check the official notification for eligibility, fees, exam details and application instructions before submitting their forms.
#SupremeCourtRecruitment #GovernmentJobs #JuniorCourtAttendant #JobAlert2026 #PatnaPress
  • AIIMS Patna organised a Cadaveric Oath Ceremony for its MBBS First Professional Batch 2026–27 on November 6. Students pledged to respect body donors and follow professional ethics, recognising donors as their first teachers in anatomy. The programme also felicitated Team Plexus, winners of the World Anatomy Day 2026 Anatomy Quiz Competition.
#AIIMSPatna #MedicalEducation #CadavericOath #BiharNews #PatnaPress
  • Patna
  • BPSC has announced the 71st Combined Competitive Mains Examination 2026 results. A total of 3,392 candidates have qualified for the interview stage out of 14,261 who appeared. The recruitment process is being conducted for 1,298 vacancies. Interview dates are yet to be announced.

#BPSC #BPSC71st #BiharJobs #BPSCResult #PatnaPress
  • Indian Railways will operate 102 pairs of festival special trains to manage the additional passenger rush during Diwali and Chhath Puja. The services will connect Bihar stations with Delhi, Punjab, Maharashtra, West Bengal, southern India and several other regions. Passengers should check the announced schedules and train details before planning their journey.
#IndianRailways #FestivalSpecialTrains #ChhathPuja #BiharNews #PatnaPress
AI Generated Representative Image : Bihar Energy Department Ensures Uninterrupted Power Supply Despite 2,599 MW Shortfall

Bihar Energy Department Ensures Uninterrupted Power Supply On Dhanteras Despite Sudden 2,599 MW Shortfall

by Priyani Pandey
November 6, 2026
0

Bihar maintained electricity supply on Dhanteras despite a sudden 2,599 MW reduction in power availability after three generating units at...

Rajgir Glass Bridge Now Open To Children Aged Five And Above

Rajgir Glass Bridge Opens To Children Aged Five And Above After Safety Audit

by Priyani Pandey
November 6, 2026
0

Children aged five years and above can now walk on the Glass Bridge at Rajgir Nature Safari after the Forest...

AI Generated Representative Image : Bihar EV Subsidy To Be Processed Within Seven Working Days Through Online Portal

Bihar Transport Department Promises EV Subsidies Within Seven Working Days, Replaces Months-Long Process With Online Portal

by Priyani Pandey
November 6, 2026
0

Bihar has introduced an online application system to speed up electric vehicle subsidies, with the Transport Department reporting around 2,000...

Patna Arts College students paint colourful Chhath-themed murals on walls along the approach road to Krishna Ghat in Patna.

PMC Gives Patna’s Ganga Ghat Roads A Festive Touch, Young Artists Paint Chhath Murals

by Priyani Pandey
November 6, 2026
0

Patna Municipal Corporation is decorating the approach roads to Ganga ghats with Chhath-themed paintings and cleanliness messages, beginning at Krishna...

AI Generated Representative Image : Bihar Energy Department Ensures Uninterrupted Power Supply Despite 2,599 MW Shortfall
Bihar

Bihar Energy Department Ensures Uninterrupted Power Supply On Dhanteras Despite Sudden 2,599 MW Shortfall

by Priyani Pandey
November 6, 2026
0

Bihar maintained electricity supply on Dhanteras despite a sudden 2,599 MW reduction in power availability after three generating units at...

Read moreDetails
Rajgir Glass Bridge Now Open To Children Aged Five And Above

Rajgir Glass Bridge Opens To Children Aged Five And Above After Safety Audit

November 6, 2026
AI Generated Representative Image : Bihar EV Subsidy To Be Processed Within Seven Working Days Through Online Portal

Bihar Transport Department Promises EV Subsidies Within Seven Working Days, Replaces Months-Long Process With Online Portal

November 6, 2026
Patna Arts College students paint colourful Chhath-themed murals on walls along the approach road to Krishna Ghat in Patna.

PMC Gives Patna’s Ganga Ghat Roads A Festive Touch, Young Artists Paint Chhath Murals

November 6, 2026
DRI officials display seized charas packets recovered during a drug seizure in Muzaffarpur.

DRI Busts Nepal-To-Pune Charas Smuggling Attempt In Muzaffarpur, Seizes 6.06 Kg Worth Rs 6.06 Crore

November 6, 2026

Recent Posts

  • Bihar Energy Department Ensures Uninterrupted Power Supply On Dhanteras Despite Sudden 2,599 MW Shortfall
  • Rajgir Glass Bridge Opens To Children Aged Five And Above After Safety Audit
  • Bihar Transport Department Promises EV Subsidies Within Seven Working Days, Replaces Months-Long Process With Online Portal
  • PMC Gives Patna’s Ganga Ghat Roads A Festive Touch, Young Artists Paint Chhath Murals
  • DRI Busts Nepal-To-Pune Charas Smuggling Attempt In Muzaffarpur, Seizes 6.06 Kg Worth Rs 6.06 Crore
AI Generated Representative Image : Bihar Energy Department Ensures Uninterrupted Power Supply Despite 2,599 MW Shortfall

Bihar Energy Department Ensures Uninterrupted Power Supply On Dhanteras Despite Sudden 2,599 MW Shortfall

by Priyani Pandey
November 6, 2026
0

Bihar maintained electricity supply on Dhanteras despite a sudden 2,599 MW reduction in power availability after three generating units at...

Rajgir Glass Bridge Now Open To Children Aged Five And Above

Rajgir Glass Bridge Opens To Children Aged Five And Above After Safety Audit

by Priyani Pandey
November 6, 2026
0

Children aged five years and above can now walk on the Glass Bridge at Rajgir Nature Safari after the Forest...

AI Generated Representative Image : Bihar EV Subsidy To Be Processed Within Seven Working Days Through Online Portal

Bihar Transport Department Promises EV Subsidies Within Seven Working Days, Replaces Months-Long Process With Online Portal

by Priyani Pandey
November 6, 2026
0

Bihar has introduced an online application system to speed up electric vehicle subsidies, with the Transport Department reporting around 2,000...

Patna Arts College students paint colourful Chhath-themed murals on walls along the approach road to Krishna Ghat in Patna.

PMC Gives Patna’s Ganga Ghat Roads A Festive Touch, Young Artists Paint Chhath Murals

by Priyani Pandey
November 6, 2026
0

Patna Municipal Corporation is decorating the approach roads to Ganga ghats with Chhath-themed paintings and cleanliness messages, beginning at Krishna...

Recent News

  • Bihar Energy Department Ensures Uninterrupted Power Supply On Dhanteras Despite Sudden 2,599 MW Shortfall
  • Rajgir Glass Bridge Opens To Children Aged Five And Above After Safety Audit
  • Bihar Transport Department Promises EV Subsidies Within Seven Working Days, Replaces Months-Long Process With Online Portal
  • Home
  • Patna
  • Bihar
  • Politics
  • Campus Buzz
  • Crime
  • Nation
  • World
  • Infra
  • Business
  • Lifestyle
  • Opinion
  • About us

© 2026 PatnaPress.com

No Result
View All Result
  • Home
  • Patna
  • Bihar
  • Politics
  • Campus Buzz
  • Crime
  • Nation
  • World
  • Infra
  • Business
  • Lifestyle
  • Opinion
  • About us

© 2026 PatnaPress.com